Deming+ app icon

Deming+

Describe the job. Get the schedule.

Deming+ is project planning software for construction and infrastructure teams. Describe a project in plain language, or add a document or drawing, and it builds a CPM schedule with activities, durations and dependencies.

  • Web app
  • CPM scheduling
  • Imports from Primavera P6

What it does

From a description to a CPM schedule.

Deming+ drafts the first schedule from your description, then covers the core scheduling work in one browser app: the work breakdown, the logic, the critical path and the baseline.

  • A schedule drafted from a plain-language description, a document or a drawing
  • Work breakdown structure, activities, durations and all four link types (FS, SS, FF, SF)
  • Critical path scheduling, with Gantt chart and network diagram views
  • Baselines, and progress tracked against a data date
  • A risk register with probability and impact scores, a heat map and mitigation tracking
  • Labour and equipment resources, with daily capacity, hourly rates and resource levelling
  • Status reports drafted by AI from the project data
  • Projects imported from Primavera P6 EPPM
  • Runs in the browser, with nothing to install

Built for civil construction, mining, infrastructure and industrial projects.

Screenshots

Inside Deming+.

  1. Gantt chart and critical path

    Phases, activities and milestones on a timeline, with the logic links drawn between them.

    Deming+ Gantt chart for a pedestrian footbridge, with phases, activities, milestones and the links between them
  2. Every activity in one table

    WBS codes, durations, planned dates, predecessors and successors, and early and late dates for each activity.

    Deming+ activity table for a pedestrian footbridge, with WBS codes, durations, planned dates, links and early and late dates
  3. Risk register and analytics

    Risks scored by probability and impact, grouped by severity, with overdue mitigations flagged.

    Deming+ risk analytics: 14 risks, their spread from critical to low, and the most recent risks
  4. Labour and equipment

    Resources with a daily capacity and an hourly rate, ready to assign to activities.

    Deming+ resource list with labour and equipment, their daily capacity and hourly rates

See Deming+ for yourself.

Start planning, or book a demo, at demingplus.com.

Go to demingplus.com